ABB has recently teamed up with India’s national electricity grid operator Power Grid Corporation of India Limited (POWERGRID) in a mega project worth over USD 640M for ABB to deliver a transmission link that will have the capacity to bring reliable electricity to more than 80 million people. The Raigarh-Pugalur 800 kilovolt (kV) ultra-high-voltage direct current (UHVDC) system will connect Raigarh in Central India to Pugalur in the southern state of Tamil Nadu.
The 1,830 kilometer (km) link will be among the longest in the world. With a capacity of 6,000 megawatts – the equivalent of more than six large power plants – it will be enough to meet the electricity needs of over 80 million people in India. The two-way link will integrate thermal and wind energy for transmission of power to high consumption centers located thousands of kilometers away, supporting electricity demands in the south, when wind strength is low, and transmitting clean energy to the north, when there is excess wind power.
ABB is the global market leader and partner of choice for stronger, smarter and greener grids around the world as it supports utilities and grid operators to take advantage of the Energy and Fourth Industrial Revolutions. ABB’s Power Grids division, which will deliver the mega project, is number one in the world in the segment. The mega project is expected to be completed in 2019.