A new process train B was brought into operation at the central processing facility at Iraq’s Badra field, operator of which is Gazprom Neft. The commissioning of this new infrastructure facility allows an increase in capacity at the central processing facility, from 45,000 to 85,000 barrels per day. Process train B is intended for the treatment and separation of hydrocarbons, and is designed to receive oil from all wells at the Badra field.