NTPC Ltd has announced that Unit-1 (660 MW) of Barh Super Thermal Power Station Stage-I (3×660 MW) has commenced the Commercial Operation.
With this, the commercial capacity of NTPC and NTPC group will become 54232.5 MW and 67657.5 MW respectively.