Suzlon wins its maiden order from Oil India Ltd.

Suzlon Group, one of the renewable energy solutions providers, has recently declared its maiden order win from Oil India Ltd (OIL) for 52.50 MW project capacity. The order comprises of Suzlon’s latest product offerings- the S111 90m tubular tower and S97 120m Hybrid Tower with a rated capacity of 2.1 MW each. The project is capable of providing power to over 28,000 households and offsetting 0.11 million tonnes of CO2 emissions per annum.
It will provide a comprehensive range of services and dedicated life cycle asset management services for an initial period of 10 years. The projects will be located at two sites, Madhya Pradesh and Gujarat. The projects are scheduled to be completed by June 2017.
The innovative S9X series product portfolio is designed to optimally harness the available wind resources and deliver higher energy and return on investment (ROI) to customers. The S97 2.1 MW wind turbine generator (WTG) features the time tested Doubly Fed Induction Generator (DFIG) technology which is designed to maximise generation and unlock low wind sites. The S97 120m is one of the tallest all-steel hybrid tower (120 meter height) in the world and combines both lattice and tubular structures. The S111 90m proto type was successfully commissioned in Tamil Nadu.

Previous articleIL&FS Engineering Services wins pipeline contract
Next articleShriram EPC awarded order worth over Rs 74 crore