The Thermax Group has won a USD 43 M contract from a leading cement company in the UAE for a turnkey captive power plant.
The scope of supply includes design, engineering, manufacturing, construction and commissioning of the solid fuel-based power plant with 2 CFBC boilers. Thermax also would be supplying emission control equipment and water treatment plant for the project, to be commissioned within 18 months.